(PRO_ERC_18/005)PRJ / Case study
KHRS – PKHQKHUDIS – BQ Flow-Lines Project
Infrastructure Works
ClientMOT
Overview
A flow-lines civil package covering 40 kilometres of right-of-way, berms, trenching and open-cut crossings.
Scope
- Right-of-way construction (OHPL)
- Trench backfilling for flow-lines (40 km)
- Berm construction for flow lines
- Excavation for sandy & rocky areas; wellsite drain pit
- Open-cut crossings 16″ & 26″
Engineering Challenge
Building a continuous, code-compliant pipeline corridor through alternating sandy and rocky ground while protecting the lines with engineered crossings.
Delivery & Outcome
ERCAN constructed the right-of-way and berms, executed selective excavation for mixed ground, and installed 16″ and 26″ open-cut crossings with proper backfill.
A 40-kilometre flow-line corridor delivered ready for pipeline installation.
Related Service
Infrastructure Works →Profile register
Cross-reference from the LIST OF PROJECTS in ERCAN PROFILE2.
- KHRS – PKHQKHUDIS – BQ Flow-Lines ProjectMOT · 8,665,450 SAR · Complete