| MEWA | Detailed Water Resources Studies in All Al-Harrat & Main Valleys Hydrology & Hydrogeology | Kingdom-wide | 94,271,000 SAR | Complete |
| MEWA | Operation & Maintenance of the Hydrological Network & OBS Wells in the Kingdom Monitoring | Kingdom-wide | 28,400,000 SAR | Complete |
| NWC | Infrastructure Work at Al-Narjes District — Supply/Apply & DW Works Infrastructure Works | Dammam | 217,070,836.35 SAR | In progress |
| Neom Spain | Drilling Well as Design & Dewatering System (2500 m × 30 m × 7 m) Hydrology & Hydrogeology | Tabuk | 23,680,009.35 SAR | Complete |
| AECOM / SAJCO | WO 07 Dewatering & Drainage Systems Hydrology & Hydrogeology | Makkah | 12,766,500.00 SAR | Complete |
| MOT / AJMI | Earthworks — Al-Ahsa / Abqaiq / Al-Dhahran Intersection Infrastructure Works | Eastern Province | 9,228,750.00 SAR | Complete |
| SBG | TCES Tunnels' Shafts — Phase 01 / Deep Wells Dewatering Scope Hydrology & Hydrogeology | Kingdom | 34,595,356.00 SAR | Complete |
| MOT | KHRS – PKHQKHUDIS – BQ Flow-Lines Project Infrastructure Works | Kingdom | 8,665,450 SAR | Complete |
| NESMA | Drilling Well as Design & Dewatering / Rehabilitation of Old Dewatering System — Ulaya Towers Hydrology & Hydrogeology | Tabuk | 6,959,991.37 SAR | Complete |
| SHOMOL / NESMA | Dewatering of 5 Towers in Aveno Project Hydrology & Hydrogeology | Riyadh | 5,215,265.27 SAR | Complete |
| ARAMCO / KENT | Execution of Infrastructure Works Dispatch Infrastructure Works | Riyadh | 5,332,000.00 SAR | Complete |
| AECOM / SAJCO | Civil Works at Khurais CPF — Mazalij & Abu Jifan Pipelines Infrastructure Works | Riyadh | 4,025,910.00 SAR | Complete |
| BEC / BEKEEN | Kharj Project of the Ministry of Transport, 205101061 Infrastructure Works | Al-Kharj | 7,332,000 SAR | Complete |
| BEKEEN | Khob Al-Rawdan No. 48 in Al-Qassim — Sub-grade Compaction / Aggregate Spread Infrastructure Works | Al-Qassim | 427,608.00 SAR | Complete |
| NESMA | Excavation & Disposal Work 45,000 m³ Construction Works | Riyadh | 3,180,256.00 SAR | Complete |
| Osais | Rehabilitation of the DWS in Three Existing Deep Wells — Ulaya Towers Stage 02 Hydrology & Hydrogeology | Riyadh | 3,998,115.00 SAR | Complete |
| Osais | Drainage System for 8293 SS Dhahrat Laban — Build and Design the Drainage DWS Hydrology & Hydrogeology | Riyadh | 1,022,884.00 SAR | Complete |
| Al Wasset | Build and Design the Drainage DWS — 8293 SS Dhahrat Laban Hydrology & Hydrogeology | Riyadh | 1,122,601.00 SAR | Complete |
| Rafen Co. | 8293 SS Dhahrat Laban Boundary Wall — Supply & Apply BW Construction Works | Riyadh | — | Complete |
| MABCO | Dewatering System Design and Construction — 5-Star Hotel Hydrology & Hydrogeology | Tabuk | 4,005,974.06 SAR | Complete |
| MABCO | Piling System Design and Construction — 5-Star Hotel Construction Works | Tabuk | 5,988,392.54 SAR | Complete |
| SMC Hospital | Hydrology Tasks — Drilling 3 DWs to Full Specification Hydrology & Hydrogeology | Riyadh | 4,501,119.00 SAR | In progress |
| SMC Hospital | Drilling 3 DWs with Full Specification in SMC03 — Hydrology Tasks Hydrology & Hydrogeology | Riyadh | 3,799,613.00 SAR | Complete |
| SMC Hospital | Build and Design DWS (Supply and Apply) — Hydrology Tasks Hydrology & Hydrogeology | Riyadh | 3,999,195.00 SAR | In progress |
| Habib Hospital | Drilling 3 DWs with Full Specification — Hydrology Tasks Hydrology & Hydrogeology | Riyadh | 1,719,111.00 SAR | Complete |
| Amalah | Drilling 3 DWs with Full Specification — Hydrology Tasks Hydrology & Hydrogeology | Riyadh | 6,792,111.00 SAR | Complete |
| SBG | Supervision for Construction on MLS-01 Electrical Shaft / DWS Hydrology & Hydrogeology | Tabuk | 10,923,119.00 SAR | In progress |
| SGS | Geo-Hydraulic Study for RS2 Shaft Report Hydrology & Hydrogeology | Makkah | 99,000.00 SAR | Complete |
| SGS | Drilling 35 DWs and Monitoring Programme — Hydrology Tasks Hydrology & Hydrogeology | Makkah | 13,790,296.00 SAR | In progress |
| ARTAR | Design and Build Dewatering System — Drainage — Hydrology Tasks Hydrology & Hydrogeology | Makkah | 1,889,917.00 SAR | In progress |
| NESMA | Riyadh New Hospital — C2.2.6 Wet Utilities (External to Buildings) Infrastructure Works | Riyadh | 79,032,662.23 SAR | Confirmed |
| AL Oyuni | Infrastructure Networks for AMAALA Triple Bay Project — Portal Water, Irrigation & Wastewater Infrastructure Works | Amluj–Al Wajeh | 21,963,420.85 SAR | Confirmed |
| Al Mane' Company | Riyadh New Hospital — Excavation 300,000 m³ / Shoring / Dewatering Design & Monitoring Hydrology & Hydrogeology | Riyadh | 54,935,777.91 SAR | Confirmed |
| NESMA | Infrastructure Networks for AMAALA Triple Bay Project Infrastructure Works | Riyadh | — | Complete |