ERCAN logo
(PRO_ERC_SAJ/TU22)PRJ / Case study

WO 07 Dewatering & Drainage Systems

Hydrology & Hydrogeology

ClientAECOM

Overview

A turnkey dewatering and drainage work order delivered for AECOM — from design through to live operation.

Scope

  • Dewatering-system design
  • Drilling tasks
  • System installation
  • Operating, monitoring & control

Engineering Challenge

Designing and commissioning a complete groundwater-control system on a compressed summer programme.

Delivery & Outcome

ERCAN handled the full lifecycle in-house: design, drilling, installation, and ongoing operation, monitoring and control.

A fully operational dewatering and drainage system delivered in roughly five months.

Related Service

Hydrology & Hydrogeology

Profile register

Cross-reference from the LIST OF PROJECTS in ERCAN PROFILE2.

  • WO 07 Dewatering & Drainage SystemsAECOM / SAJCO · 12,766,500.00 SAR · Complete